Project: Lake Washington Residence Problem: Home had settled 3 1/2” on the East side of the downhill slope. The settlement had caused 2 large cracks in the foundation on the North and South sides. Interior floors were noticeably out of level. Solution: Installed...
Project: Redmond Condo Problem: Condo unit had settled as much as 1 5/8” on the perimeter of the building and the interior floor slab had settled, opening up to a 1” crack approximately 25’ long. The settled condo unit had been built on fill at the top of a ravine....